Abstract

Abstract We have applied a pile-up Monte Carlo simulation code on gamma spectrum of a prompt gamma neutron activation analysis (PGNAA) system. The code has been run in nonparalyzable mode for a specific geometry of a PGNAA system with 241 Am– 9 Be source and NaI(Tl) detector to obtain the distortion due to “pile-up” in the pulse height of gamma spectrum. The results show that the main background in the nitrogen region of interest (ROI) is due to two pile-ups. We have also evaluated the variation of count rate and total photon sampling over the Monte Carlo spectra. At high count rates, not only the nitrogen ROI but also carbon ROI, and hydrogen peak are disturbed strongly. Comparison between the results of simulations and the experimental spectra has shown a good agreement. The code could be used for other source setups and different gamma detection systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.