Abstract
This paper deals with the reliability worth assessment of electric power distribution system considering momentary interruptions. Reliability worth study quantifies the interrupted energy and also monetary losses incurred by utility customers due to electric power failures. Sequential Monte Carlo (MC) simulation technique is applied for the assessment purpose. The advantage of using MC simulation over the analytical approach is that uncertainty of associated random variables can be taken into consideration in MC simulation. Case studies are conducted on the Roy Billinton Test System connected to bus 4 distribution system. The results of MC simulation technique are complementary to those calculated by the analytical method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.