Abstract

The power system loading margin enhancement problem to determine an optimal Static Synchronous Compensator (STATCOM) installation can be formulated as a mixed discrete-continuous nonlinear optimization problem (MDCP). In the paper, long-term efficiency of STATCOM installation to enhance transmission system loading margin (LM) is evaluated using a Monte Carlo Simulation (MCS) procedure with an Ordinal Optimization (OO) based STATCOM installation strategy to solve the MDCP. First under each N-1 contingency with bigger risk index (RI) value, the crude model is used to estimate the rough solution for each candidate, and then the exact method is used to a smaller set to determine the good enough solutions. Obtained from the union of the respective good enough solutions for all considered contingencies, the scheme with the smallest number of STATCOM units enabling the network to provide required average LM is recommended.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.