Abstract

Fielding a cryogenic ICF capsule for near-term ignition shots requires a fill-tube to deliver fuel to the capsule. Polymer capsules (0.9 and 3.1 mm o.d.) with a monolithic fill-tube have been produced. The fill tube is formed on the capsule by plasma polymer coating on a mandrel with a depolymerizable stalk. We report recent advances achieved in monolithic fill-tube capsule production. The micro-assembly station for attaching PAMS stalk to the mandrels was improved to reduce fillet and fill tube diameters and increase throughput. Excimer laser etching is used to micro-machine fill-tube capsules and target components to allow proper mating for assembly. The fill-tube target is attached to the gas source by a flexible polymer fill line and was tested to confirm gas flow and retention. The effect of the mandrel stalk on the uniformity of GDP coating is investigated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.