Abstract
The presented study is devoted to monitoring the technical and technological state of electric power complex facilities. As part of the study, the basic principles of monitoring and examining the state of equipment were analyzed, the process and procedure for monitoring the status of equipment and structures of the electric power complex were examined. The work analyzed the periods of preparation for the heating season of the Russian electric power industry, as a result of which it was revealed that the number of violations at electric power facilities was increasing, and the equipment of the federal districts was not fully prepared for the heating season by the readiness index. The work revealed that for almost all indicators of heat supply, water supply and sanitation, the number of violations and incidents during the heating period is increasing. At the end of the study, measures were presented that will ensure the stability and reliability of energy supply to consumers.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.