Abstract

Monitoring is playing an important role on the building under construction (especially in deep foundation construction phase). By professional, scientific and timely monitoring, reliable monitoring data and information on security incidents that may occur can be provided timely. In this paper, Guang'anmen Hospital outpatient building foundation pit project was analyzed. The horizontal displacement at the top of supporting structure and settlement of the surrounding buildings were discussed. The results show that the horizontal displacement and the impact on surrounding buildings is within a permissible range, which entailed the safety of the foundation pit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.