Abstract

This plan describes the fiscal year 1998 vadose monitoring of three inactive, liquid waste disposal facilities associated with the Plutonium Finishing Plant (Z-Plant): the 216-Z-1A Tile Field, the 216-Z-9 Trench, and the 216-Z-12 Crib. Monitoring will consist of spectral gamma ray logging of 21 boreholes. This plan describes the physical characteristics of the facilities, their operational histories, the subsurface geology and known contamination distribution at each facility. The plan then describes the specific monitoring to be done including the boreholes to be logged, the methods of data acquisition, data reduction, and data evaluation, and finally, the quality control, data management and data reporting for this effort. The three liquid waste disposal facilities at the Z Plant were chosen to be monitored because they were identified as containing some of the most significant sources of radioactive contamination in the Hanford vadose zone. Johnson`s analysis was based on the relative hazard obtained by combining curie quantities disposed to the facilities with appropriate health risk standards. The basic question to be addressed by this logging activity addresses the configuration of subsurface contamination since it was last measured. Historical data from the 216-Z-1A Tile Field, the 216-Z-9 Trench, and the 216-Z-12 Crib form the baseline for comparisons to answer this question.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.