Abstract

The Alamillo Bridge is one of the long-span bridges crossing the Guadalquivir River. It was built on the occasion of Expo '92 in 1992 in Sevilla, Spain. The bridge is a cable-stayed structure spanning 200 m without any intermediate supports. Its originality is the lack of back stays and the balancing of the front stays through the backward inclination of a massive pylon. This paper shows the importance of experimental in situ techniques when applied to unconventional civil engineering structures and how—with the help of an important amount of accurate instrumentation, monitoring the most important experimental variables—it was possible to build the bridge correctly, safely, and on schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.