Abstract

The article presents selected results and the sequencing of research into the project "Long-Term Monitoring of Rail Structures in Tramway Crossings with a Focus on Shallow-Grooved Crossings Aimed at the Optimization of their Maintenance and Noise Reduction", which was running with support from the Technology Agency of the Czech Republic within the Zeta Project (project registration No. TJ04000257) in 2020-2022. The project was elaborated jointly with the Prazska strojirna a.s. Company in cooperation with the Prague Public Transit Company (hereinafter PPTC). The project's objective was to optimize the maintenance of tramway tracks with a focus on shallow-grooved crossings in rail structures taking into account the noise emission levels during the life cycle of these crossings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.