Abstract

This article deals with issues of the quarry drill rigs operation. They are the rigs with top hammer, or down the hole hammer drills, primarily used during the preparation of blasting. The article is focused on the monitoring of costs and economic management. The introductory part of the article provides a description of all costs, and their division to fixed and variable costs. In the next part, figures of particular costs are provided for specific selected locations in the Czech Republic. Also, the article deals with proposals for the monitoring, evaluation, and reduction of the costs. Separately, the fixed costs are covered, with the evaluation of turn points in various conditions. The proposals for the reduction of variable costs are provided separately. In the article conclusion, summary of recommended measures is provided. Key words: drill rig, costs monitoring, blasting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.