Abstract
Rapid development in underground drivages is the need of the hour to reduce the gestation period of mining and tunnelling projects. Despite the introduction of modern rock cutting machines, namely, tunnel boring machines, road headers, continuous miners etc., blasting still is the common excavation technique owing to its adaptability in wide ranging geo-mining conditions. Faster drivage rates are possible with the longer blast holes drilled by multi-boom drill rigs and wide range and type of delays available now-a-days. Since longer pulls are associated with high concentration of explosives they often cause overbreak due to excessive ground vibrations. Overbreak increases the overall drivage cost due to extra support and mucking required. Most of the existing controlled blasting techniques, namely, line drilling, pre-splitting, smooth blasting, micro-sequential contour blasting etc., need additional drilling and sophisticated delays and thus become costly to adopt in day toIn this paper, a brief discussion on the previous research conducted on the near-field vibration estimation models and threshold levels of PPV for rock damage is provided initially. Subsequently, both the near and far-field vibrations monitored in underground drivages of a Chromite mine and the threshold level of PPV for overbreak estimated from them are compared.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.