Abstract

The Tanah Baru Depok Road is 4.12 km in length consisting of two lanes connecting the Jakarta-Depok route. Current conditions with a road width of 5.2m during the rainy season on the right side of the new dirt road, there are certain parts of the STA, there are certain road conditions that are cracked and landslides. rainy season. The purpose of this research is to conduct monitoring and evaluation of the handling that has been done on the highway, as well as providing these results to make planning for the prevention of landslide prone roads. Stages of methods to be carried out during monitoring are identification of landslide hazard locations (not / moderate / already handled), identification of causes of landslides, identification of consequences, morphological analysis, geology, hydrology, and land use. Whereas in the evaluation stage is the analysis of the handling that has been done and the determination of new treatments. The results of monitoring and evaluation are there are 5 locations on STA Km 3 + 240 and STA Km 3 + 650 landslides, STA Km 1 + 970 and STA Km 2 + 450 potential landslides, STA Km 3 + 840 have dangerous roadside because there is no road divider. Countermeasures for landslide areas are carried out by installing a retaining construction on the right side of the road that intersects the river in the form of a cantilever wall. +840 mounted guardrail to prevent vehicles from entering the river bank..

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.