Abstract
This study evaluated the behaviour of a concrete face rockfill dam (CFRD) built on river gravel foundation on the basis of in-situ measurement records and numerical analysis. The monitoring records were obtained from a detailed deformation-monitoring system. A 3D finite element analysis was performed to assess long-term dam behaviour. The behaviour of the CFRD built on river gravel foundation was analysed comprehensively. A discussion of behaviour, especially with relevance to the behaviour of dams built on stiff-foundation, was included. The effect of the river gravel foundation was analysed, and the exact mechanisms were discussed. The relative contribution of various factors on the long-term behaviour of the CFRD was also studied. In-situ measurements were compared with numerical results to discuss the capability of the numerical model to predict the dam behaviour.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.