The Line 3 Extension from Aghia Marina to Piraeus constitutes one of the most significant construction projects in full development in Athens Greater area. For the management and abatement of the air borne noise generated from surface, and/or underground construction activities, relevant machinery operation, and trucks movements at open worksites and the tunnel, a continuous monthly noise and vibration monitoring program is enforced in order to assess any potential intrusion of the acoustic environment. On basis of measured 24 hour Leq noise levels, both Lden and Lnight EU indices were assessed along with vibration velocity for every worksite and tunnel construction activity. The existing environmental noise background generated mainly from road traffic was assessed in order to evaluate potential effects on both air borne noise from construction activities. This comprehensive monitoring program aims to protect the inhabitants in the vicinity of worksites and the tunnel surrounding from construction noise and vibration processing and evaluating all necessary mitigation measures. Especially, for the protection of sensitive receptors, this program may serve as a tool ensuring a successful management of both noise and vibration levels emitted from open air construction activities and (Tunnel Boring Machine) TBM or hammer/pilling operation by implementing mitigation measures where necessary.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call