Abstract
Gravel-packed gas wells completed in the Gulf of Mexico since 1980 were reviewed to build a selective database for a completion-effectiveness study. Gas wells with clean, uniform sands were selected for analysis. Significant monitoring data identified were injectivity tests at different points during the completion and fluid loss rates (barrels per hour). Injectivity before gravel pacing and productivity after gravel pacing were classified according to sidewall-core permeabilities. Different gravel-pack preparation and execution techniques were reviewed. Fluid-loss-control pills were identified as the greatest source of damage restricting gravel-packed well productivity. Injectivity tests and sidewall-core permeabilities provide valuable information for monitoring well completion procedures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.