Abstract

In order to insure the safety and stability of the existed dam body and dam curtain during the diversion tunnel excavation, the vibration velocities were analyzed based on in-site blasting vibration monitoring. Result shows that the elevation difference between explosion point and monitoring points has a great impact on the vibration velocity in addition to single fire dynamite and blast center distance. During data analysis, the traditional empirical formula of attenuation of blasting earthquake must be amended. Through contrasting and analyzing, the amended formula of attenuation of blasting earthquake wave is precise relatively. At the same time, two collapses during the diversion tunnel excavation were analyzed based on the characteristics of layered rock mass and fault distribution, and the explosion parameters were optimized, so that the damage effect of blasting vibration was controlled effectively. This research also takes a good effect in other similar works.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.