Abstract

This study investigates the effect of chloride contamination and reinforcing steel corrosion in a concrete slab on the ground penetrating radar (GPR) signal. A reinforced concrete slab with two layers of steel bars and chloride contamination was used in this study. The corrosion process was accelerated by impressed current technique in both wet and dry condition to simulate the corrosion in both wet and dry seasons. During the process, GPR measurements were carried out periodically to monitor signal changes. The results were analyzed to study the GPR signal amplitude, travel time, frequency spectrum and signal energy response to chloride contamination and reinforcing steel corrosion in concrete.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.