Abstract

There are six key points, such as steel truss column, hoisting frame, hoisting point, wire rope, wire rope connecting in the hoisting system which we construct the COMAC ministry of installed plant. This timely monitoring of several key points in the promotion process is to enhance the process controlled several indicators. For different key points used different monitoring methods for monitoring. The results showed that 6 monitoring method is reasonable, feasible. This method can provide some experiences to the construction and fabrication of the steel member of the project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.