Abstract

In this paper, a multi-objective hybrid flowshop rescheduling problem (HFRP) is addressed in a dynamic shop environment where two types of real-time events, namely machine breakdown and job cancellation, simultaneously happen. For the addressed problem, two objectives are considered. One objective concerning the production efficiency is minimizing the maximum completion time or makespan, while regarding with the instability, the total number of the jobs assigned to different machines between the revised and the origin schedule is considered. A multi-objective evolutionary algorithm based on decomposition (MOEA/D) is applied to solve this problem. In the algorithm, the weighted sum approach is used as the decomposition strategy. The algorithm is, then, rigorously compared with three state-of-the-art evolutionary multi-objective optimizers, and the computational results demonstrate the effectiveness and efficiency of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.