Abstract

Recently, emergency structures have been in the spotlight because of the coronavirus disease (COVID-19) pandemic. This research examines the use of modular integrated construction (MiC) in developing an emergency hospital for individuals with novel coronavirus-infected pneumonia (NCIP). The whole process of building is based on the modular design and assembly idea. The primary structure was constructed using the modular steel buildings (MSBs) concept to suit emergency structures’ functional qualities and quick construction needs. An intelligent operation and maintenance management platform was built utilizing 5G, AI, IoT (IoT), cloud, big data, an d other technologies. A BIM model was created to evaluate and compare the construction plan, develop the combined section and connection node plan, and complete the detailed design of assembled steel structures. On-site modularization of fundamental structural components and accessories is utilized in a flowing operating mode, where the housing and supporting installation are closely coordinated. The research results show that information and data interaction is the key to speedy building design and construction, with digital simulation in one stage and on-site assembly in a crammed way. The study findings may be used to build comparable structures faster, utilizing modular building techniques.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.