Abstract

Simulation models of Hydro Power Plant (HPP) are complex and highly nonlinear control system, composed of tunnel, penstock, surge tank, hydro turbine and hydroelectrical governor models. Hydro Power Plant (HPP) models recommended by the IEEE working group is revised and is used for simulation of the transient and static response of the system of hydro turbine and auxiliary equipment. Verification was made using measurements of static and transient responses from real HPP. Modification of simulation model is made after comparison of the simulated response of the HPP simulation model and real response of the HPP with PID controller. Modification and adjustment of the two parameters of the model is made to adjust the static response of the model without affecting transient response and with consideration of smallest frequency and power error.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.