Abstract

Dodge (1943) introduced a single level attribute continuous sampling plan designated as CSP-1 for the application of continuous production processes. Govindaraju & Kandasamy (2000) developed a new single level continuous sampling plan whose sampling inspection phase is characterized by a maximum allowable number of non-conforming units c, and a constant sampling rate f and was designated as CSP-C. In this paper, a modification is proposed on the CSP-C continuous sampling plan. In this modified plan, sampling inspection is continued until the occurrence of c+1 non-conforming units, provided the first m sampled units have been found conforming during the sampling phase. Using a Markov chain model, expressions for the performance measures of the modified CSP-C plan are derived. The main advantage of the modified plan is that it is possible to lower the average outgoing quality limit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.