Abstract

Dodge (1943) introduced a single level attribute continuous sampling plan designated as CSP-1 for the application of continuous production processes. Govindaraju & Kandasamy (2000) developed a new single level continuous sampling plan whose sampling inspection phase is characterized by a maximum allowable number of non-conforming units c, and a constant sampling rate f and was designated as CSP-C. In this paper, a modification is proposed on the CSP-C continuous sampling plan. In this modified plan, sampling inspection is continued until the occurrence of c+1 non-conforming units, provided the first m sampled units have been found conforming during the sampling phase. Using a Markov chain model, expressions for the performance measures of the modified CSP-C plan are derived. The main advantage of the modified plan is that it is possible to lower the average outgoing quality limit.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.