Abstract

In the thermal power plant, as an important auxiliary equipment of turbine, the condenser plays an important role in the normal operation of power plant. At present, the domestic operating unit has a large number of old condenses, which has low efficiency and emerging problems because of the increasing running time. Therefore, the transformation of old condenser becomes an important means to tap the potential of the old unit. In this paper, we transform one 300MW unit condenser with its tube layout, then through the numerical simulation and date analysis of the condenser before and after transformation to explore the possibility of modification.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.