Abstract

A Water Detritiation System (WDS) is required for the ITER Tritium Plant in order to process tritiated water which is accumulated in various subsystems (e.g. the hall ventilation systems). For the ITER-WDS, the Combined Electrolysis Catalytic Exchange (CECE) process with an electrolyser unit as one of the major components is envisaged. An experimental WDS was built and commissioned at the Tritium Laboratory Karlsruhe (TLK) for the investigation of various subsystems of the CECE process in tritium environment. The TLK-WDS consists of an 8 m Liquid Phase Catalytic Exchange column and two Solid Polymer Electrolyte electrolysers, each with a maximum hydrogen output of 1 m 3/h. The commercially available Hogen40 electrolyser units from Proton Energy Systems are not tritium compatible concerning materials, joints and quality documentation (e.g. necessary certificates). In order to process tritiated water with tritium concentrations up to 370 GBq/kg, tritium compatibility had to be ensured by appropriate modifications. Up to now, the modified system has been operated with tritiated water for 3500 h, the maximum tritium concentration in the electrolysers being 190 GBq/kg. This contribution reports on the necessary modifications of the electrolyser units and the experiences gained thereby. The results are equally important for the ITER-WDS, where the maximum tritium concentration in the feed water of the electrolyser units will be even higher with 11 TBq/kg.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call