Abstract

We present the main reasons for reconstruction of the standard 300 MW power unit with K-300-240 steam turbine into the combined-cycle installation using an Alstom gas-turbine unit with an installed capacity of 180 MW. Implementation of the project makes it possible to increase the unit capacity of the power unit, without hardly any changes in existing infrastructures, most efficiently use organic fuel, as well as reduce hazardous emissions under combined (steam-gas) and independent (using steam cycle) modes of operation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.