Abstract

A general model for the actuarial risk-reserve process as a superposition of compound delayed-renewal processes is introduced and related to previous models which have been used in collective risk theory. It is observed that non-stationarity of the portfolio ‘age-structure' within this model can have a significant impact upon probabilities of ruin. When the portfolio size is constant and the policy age-distribution is stationary, the moderate- and large-deviation probabilities of ruin are bounded and calculated using the strong approximation results of Csörg et al. (1987a, b) and a large-deviation theorem of Groeneboom et al. (1979). One consequence is that for non-Poisson claim-arrivals, the large-deviation probabilities of ruin are noticeably affected by the decision to model many parallel policy lines in place of one line with correspondingly faster claim-arrivals.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.