Abstract
This article presents models of production line systems with two flexible workstations. Flexible stations have the capability of switching from one operation to another when they become either blocked or starved. The objective is to determine and compare the production rates of serial and parallel arrangements of the workstations. It is shown that, in general, the serial arrangement achieves higher efficiency. Under some specific assumptions, however, both arrangements have the same production rate. An extension of the analysis of two stations to n stations for the parallel case is also presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Flexible Manufacturing Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.