Abstract
A multi-stage production line consists of a series of machines, which are subject to failures owing to wearouts and other random causes. While random failures are unavoidable and need corrective maintenance (CM), wearout failures can be avoided by preventive maintenance (PM), including tool change operations. Both types of maintenances can cause significant production losses, particularly if the production line is automated and the stations are rigidly linked. Therefore, intermediate buffers are introduced to decouple the rigidly linked machinery and to localize the losses caused by equipment stoppages. Reliability and productivity calculations of multi-stage lines with storage units can be quite complex. Furthermore, closed form solutions are generally not possible when preventive and corrective maintenances are incorporated into the model. In this paper, we present a discrete mathematical model integrated into an iterative simulation procedure to determine the production output rate of a multi-stage line with corrective and preventive maintenance operations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Computer Integrated Manufacturing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.