Abstract

Delay time analysis is used to model the maintenance practices for coal face machinery within British Coal. This model is used to predict the effectiveness of condition monitoring using the resultant downtime of machinery as the relevant measure. Numerical examples of the models developed are presented using data obtained from collieries in the course of the research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.