Abstract
This paper discusses the problem of controlling a multiple-stage industrial evaporator in a sugar factory. The control objectives are: syrup should have a sucrose concentration of 72%, the evaporator should produce the required amount of steam, and the steam consumption should be as low as possible. Achieving these objectives is difficult, due to the following plant features: strong disturbances, large time delays and many constraints. The control problem is solved by developing a physical model which is used as benchmark; then, a parametric identification is performed to obtain a control model. Finally, a successful real-time application of a multivariable GPC controller is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.