Abstract
Eurasian beaver (Castor fiber) populations are expanding across Europe. Depending on location, beaver dams bring multiple benefits and/or require management. Using nationally available data, we developed: a Beaver Forage Index (BFI), identifying beaver foraging habitat, and a Beaver Dam Capacity (BDC) model, classifying suitability of river reaches for dam construction, to estimate location and number of dams at catchment scales. Models were executed across three catchments, in Great Britain (GB), containing beaver. An area of 6747 km2 was analysed for BFI and 16,739 km of stream for BDC. Field surveys identified 258 km of channel containing beaver activity and 89 dams, providing data to test predictions. Models were evaluated using a categorical binomial Bayesian framework to calculate probability of foraging and dam construction. BFI and BDC models successfully categorised the use of reaches for foraging and damming, with higher scoring reaches being preferred. Highest scoring categories were ca. 31 and 79 times more likely to be used than the lowest for foraging and damming respectively. Zero-inflated negative binomial regression showed that modelled dam capacity was significantly related (p = 0.01) to observed damming and was used to predict numbers of dams that may occur. Estimated densities of dams, averaged across each catchment, ranged from 0.4 to 1.6 dams/km, though local densities may be up to 30 dams/km. These models provide fundamental information describing the distribution of beaver foraging habitat, where dams may be constructed and how many may occur. This supports the development of policy and management concerning the reintroduction and recolonisation of beaver.
Highlights
Beaver reintroduction and recolonisation across Europe provides opportunities for conservation and provision of ecosystem services
We present a new Beaver Forage Index (BFI) model which describes the spatial distribution of beaver foraging habitat and uses this information to inform the Beaver Dam Capacity (BDC) model
A scenario whereby all reaches within a catchment contain signs of beaver activity, at any one time, is highly unlikely; these figures should be considered an upper estimate of what may be expected if catchments reach population carrying capacity and no management, such as the removal of beaver or dams, is undertaken
Summary
Beaver reintroduction and recolonisation across Europe provides opportunities for conservation and provision of ecosystem services (de Visscher et al 2014; Law et al 2016; Puttock et al 2017, 2018). For the species to coexist with humans, in densely populated and intensively managed landscapes, informed policy and management is required (Auster et al 2019; Crowley et al 2017; Gaywood et al 2015) This should be based on a strong understanding of where beaver are likely to be active, where dam impacts/opportunities occur and how many dams may be expected in a catchment. Their ability to significantly modify fresh water habitats through dam building, lodge constructing, tree felling and excavating canals and burrows has earned beavers the title of ecosystem engineer (Gurney and Lawton 1996). Beaver dams vary in size and structure (see examples in SI.11) depending on purpose, environmental setting, channel geometry, age and hydrological regime
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.