Abstract

In order to evaluate different design assumptions, able to mitigate hydrological risk and protect the town of Chiavari (located in the north eastern part of Liguria region, Italy) from flood events of Rupinaro river, a detailed analysis of the temporal development of floods needs to be carried out. This work compares the volume in the stilling catchment to the total volume of flood starting from accurate hydrographs of flood events and rate of assigned return period. As a matter of fact, the general tendency of engineers and public administration is to adopt excessively conservative conditions which, decisively far from being real, end up discouraging and impeding projects. This work aims to provide reliable flood hydrographs associated to given return periods for the ungauged catchment of Rupinaro river, those hydrographs are necessary to design millwork dams.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.