Abstract

In this paper, we present a formulation for the ready-mixed concrete scheduling problems with time-dependent travel time. Traffic congestion is a major problem for the business of delivering RMC. It may lead to late deliveries of RMC to construction sites, and because RMC is perishable, late deliveries also mean large additional costs for both batch plants and the construction companies. Additional costs caused by traffic congestion can be reduced by taking predictable traffic congestion into account in the process of scheduling. For this purpose we develop a model with consideration of traffic congestion of RMC which uses a heuristic approach based on local search algorithm to solve. A detailed case study based on industrial data is used to illustrate the potential of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.