Abstract
Energy storage systems (ESSs) are increasingly used in small islands that are not connected to the continental grid and, hence, only rely on local power sources (e.g. diesel generators). The use of ESSs allows to efficiently adapt to load seasonal variations and changes in renewable energy production as well as to increase the efficiency of diesel generators. On the other hand, achieving a proper dimensioning of system components and efficient operation of an ESS in an established power station may be a non-trivial task. In order to assist this process, preliminar modelling and simulation are fundamental steps, as they allow to work on “virtual prototypes” of the plant, enabling efficient components dimensioning as well as the development and test of system operation strategies. In this work, a Matlab-based simulation tool is developed for an ESS installation in Ventotene island in the Mediterranean Sea. The system model is detailed and simulation results are provided, showing that the developed simulation tool is able to describe both long-term dynamics and transient phenomena. The final user of the simulation tool is the industrial partner, i.e. Enel S.p.A., that has provided the technical information on the Ventotene power station.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.