Abstract
Conducted electromagnetic compatibility (EMC) noise qualification tests are normally carried out after a prototype has been designed, built and tested and the process is repeated in the event of non-compliance. The ability to determine compliance with electromagnetic interference (EMI) standards at the design stage is therefore desirable. This study will present conducted EMC noise modelling and measurement techniques, yielding simulated and measurement noise results accurate enough to serve as a prequalification test at the design and prototyping stages, respectively. Accurate models of the power feed line connecting the line impedance stabilisation network to the device under test (converter), including the load are developed. Predictive conducted EMC modelling is accomplished using detailed active level 3 SPICE-based models, creating a real-time circuit model consisting of a complete converter in its operational state, without the need to separate into equivalent models. Effects of the power feed-line length on EMI noise measurements are investigated as currently available literature has not dealt adequately with this issue. The modelling and measurements are performed using software and instruments available in a development laboratory..
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: IET Science, Measurement & Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.