Abstract

The performance of a scheduling system, in practice, is not evaluated to satisfy a single objective, but to obtain a trade-off schedule regarding multiple objectives. Therefore, in this research, we make use of one of the multiple objective decision-making methods, a global criterion approach, to develop a multi-objective model for solving FMS scheduling problems with consideration of three performance measures, namely minimum mean job flow time, mean job tardiness, and minimum mean machine idle time, simultaneously. In addition, hybrid heuristics, which are a combination of two common local search methods, simulated annealing and tabu search, are also proposed for solving the addressed FMS scheduling problems. The feasibility and adaptability of the proposed heuristics are investigated through experimental results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.