Abstract

A pre-combustion CO2 capture system was modelled with three different membranes. It comprised an amine absorber for the elimination of H2S, high- and low-temperature water gas shift reactors for the conversion of CO to CO2 and a membrane to keep over 90% of the CO2 in the retentate. The absorber and equilibrium reactors were modelled using rigorous models, while the partial least squares model was used for three different types of membranes to predict the experimental results. The effectiveness of the modelling of the reactors and membranes was tested through comparison of simulated results with experimental data. The effects of operating pressure and membrane type are also discussed, and it was found that using a smaller membrane under high pressure lowered the membrane’s cost but also lowered energy recovery.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.