Abstract
Batch processors can concurrently process more than one job, and are commonly used in complex manufacturing systems such as wafer fabrication facilities (wafer fabs). Previous work has shown that there can be a significant reduction in cycle time when the control of the upstream serial processor is dependent on the batch processor. We wish to determine whether this is also true when the upstream processor is also a batch processor, with smaller capacity. We model a two-stage system with an upstream batch processor and a downstream batch processor under differing simple control policies as a continuous time-discrete state Markov chain. In doing so, we show that the concept of constraining the production of the upstream processor in accordance to the anticipated needs of the downstream batch processor can similarly reduce mean system cycle time when the upstream processor is a smaller batch processor. We also perform simulation experiments, using parameters close to those found in wafer fabs, and confirm that the strategy of prioritising the formation of larger batches for the downstream batch processor typically results in substantial cycle time reductions for the two-stage system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.