Abstract

A load forecasting technique, based upon an autoregressive (AR) method is presented. Its use for short term load forecasting is assessed by direct comparison with real forecasts made by human operators of the Lerwick power station on the Shetland Islands. A substantial improvement in load prediction, as measured by a reduction of RMS error, is demonstrated. Shetland has a total installed capacity of about 68 MW, and an average load (1990) of around 20 MW. Although the operators could forecast the load for a few distinct hours better than the AR method, results from simulations of the scheduling and operation of the generating plant show that the AR forecasts provide increased overall system performance. A detailed model of the island power system, which includes plant scheduling, was run using the AR and Lerwick operators' forecasts as input to the scheduling routine. A reduction in plant cycling, underloading and fuel consumption was obtained using the AR forecasts rather than the operators' forecasts in simulations over a 28 day study period. It is concluded that the load forecasting method presented could be of benefit to the operators of such mesoscale power systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.