Abstract

The rate of hydrogen removal from molten steel in a vacuum arc degasser (VAD) is simulated using a three‐phase (slag‐argon‐steel) Eulerian model. The time required to degas a 100 tonne melt from 5 to 1.5 ppm is predicted for a series of ladle aspect ratios and plug layouts. Compared to an axisymmetric single plug system, the degassing time can be reduced by 36% with the use of three equiangular plugs. Increasing the aspect ratio (AR) of the melt from 0.8–1.2 leads to an improvement in degassing performance, followed by a reduction in performance between AR = 1.2–1.6. A radial plug position of 0.5R is optimal for achieving low hydrogen levels in the melt. Reducing the inter‐plug angle from θ = 180° (for double plug) and θ = 120° (for triple plug) to θ = 45° further reduces this time by 18 and 3.8%, respectively. The fastest rate of hydrogen removal is obtained through the use of three plugs at positioned at an angle of θ = 45° and plug radial position of 0.5R.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.