Abstract

The current methods of project planning by network analyses and the assumed relationships between activity duration, cost, start date and risk elements are reviewed. The concept of modeling the interdependencies between activities by means of milestone data achievement is presented. The Graphical Evaluation and Review Technique (GERT) of structuring conditional branching and discrete probabilistic outcomes in scheduling networks are used to develop probable frequency distributions of project duration and cost. The role of the milestone model in project planning is illustrated by an example of a small highway construction project with weather sensitive operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.