Abstract
Planning and scheduling critical resources in hospitals is significant for better service and profit generation. The current research investigates an integrated planning and scheduling problem at different levels of operating rooms, intensive care units, and wards. The theory of constraints is applied to make plans and schedules for operating rooms based on the capacity constraints of the operating room itself and downstream wards. A mixed integer linear programming model is developed considering shifting bottleneck resources among the operating room, intensive care unit, and hospital wards to maximize the utilization of resources at all levels of planning. Different sizes of planning and scheduling problems of the hospital, including small, medium, and large sizes, are created with variable arrivals and surgery durations and solved using a CPLEX solver for validating the developed models. Later, the application of the proposed models in the real world to develop planning systems for hospitals is discussed, and future extensions are suggested.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.