Abstract

In the course of the research, an analysis of the development of geological and technical measures at various fields was carried out. The justified application of these measures has been studied, and recommendations have been made to increase the efficiency of oil recovery based on drilling wells with modified valve assembly parameters. The conducted research allows us to obtain optimal performance indicators of pumping equipment associated with such parameters as pressure, flow, taking into account the lowest cost of repair work. For this purpose, modeling of geological and technical measures based on drilling a well with modified parameters of the hydraulic assembly of the drilling pump has been developed. This design solution allows you to obtain optimal performance of the drilling pump, taking into account the lowest costs for current and major repairs. These studies aimed at finding optimal geological and technical measures (GTM) related to increasing the productivity of drilling pumps and oil recovery in general are very promising and relevant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.