7-days of FREE Audio papers, translation & more with Prime
7-days of FREE Prime access
7-days of FREE Audio papers, translation & more with Prime
7-days of FREE Prime access
https://doi.org/10.1080/15325008.2018.1444689
Copy DOIPublication Date: Feb 7, 2018 | |
Citations: 13 |
Wind turbines with higher power ratings are desired to reduce construction cost and maintenance time and increase energy yields. Three-phase induction generators are widely used in renewable power generation. Self-excited, squirrel cage induction generators are ideally suited for remote, standalone applications of low and medium power generation. The emerging multiphase induction generator (MPIG) with phases more than three is receiving significant attention for high power applications. This paper aspires at the performance investigation of five-phase induction generator (FPIG) in self-excited mode for standalone wind applications. The dynamic model of FPIG is developed using Matlab/Simulink. The performance of wind-driven FPIG under different operating conditions has been analyzed. The process of voltage build-up, current and torque under no load and loaded conditions are presented. The results are compared with three-phase self-excited induction generator (SEIG) to show the effectiveness of FPIG for high-power wind generation.
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.