Abstract

With the recent trend of company acquisitions and mergers, it is likely that the company that results from a merger will own multiple facilities with overlapping manufacturing capabilities. By shifting the production of parts to different plants, capacity can be better utilized, and the overall cost to the company can be reduced. This paper addresses the sourcing decisions of allocating parts to several internal facilities or to an external supplier. This multiple-plant sourcing problem (MPSP) is modeled as a multiple-choice multidimensional knapsack problem that considers the capacity of each facility and the costs associated with supplying a part at each facility and externally. We present results from an analysis of two-, three-, and four-facility MPSP models and find that the two-facility model is the most difficult to solve. Additionally, we model extensions that incorporate allocating a part to more than one facility with various inventory strategies, and consider how these extensions affect the sourcing decisions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.