Abstract

This paper is concerned with the problem of how to place hazardous material cars in the train assembly process so that the overall derailment risk can be minimized. The approach considers both the probability of railway cars derailing en route by position as well as the risk associated with additional operations in the rail yard using recent US FRA data. The merits of this car placement model are illustrated through a case study of a railway corridor that connects Los Angeles (CA) to Chicago (IL). The case study demonstrates that the proposed risk minimization strategy could be implemented with minimal rail yard operation cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call