Abstract

Results of investigation of switching and temporary overvoltages onto 400 kV electrical networks before and after reconnection of electric network of the South-East Europe with other part of European electric network in UCTE zone are presented. Investigations are performed at 400 kV overhead lines Banja Luka-Tuzla and Mostar-Konjsko (Croatia), using EMTP-ATP. Validation of simulating model are performed at 220 kV electrical network, transmission line thermo power plant Kakanj-Switchyard Kakanj, where switching overvoltages were measured

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.