Abstract

A mathematical programming model is proposed to formulate a closed-loop network in the aerospace industry where remanufacturing of customer-owned components and transforming of defective components are allowed. Remanufacturing, a special type of manufacturing activity to recapture the value added to the materials when a product was first manufactured, has been one of the strategies to reduce negative environmental impacts of the disposal of products. A scenario analysis approach is used to consider varying remanufacturing lead time as well as defect rates of disassembled components. Further, sensitivity analysis is conducted to reveal insight on the effects of input factor variations on profit and amount of scraps.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.