Abstract

The deployment of public charging infrastructure networks has been a major factor in enabling electric vehicle (EV) technology transition and must continue to support the adoption of this technology. DC fast charging (DCFC) increases customer convenience by lowering charging time, enables long-distance EV travel, and could allow the electrification of high-mileage fleets. Yet, high capital costs and uneven power demand have been major challenges to the widespread deployment of DCFC stations. There is a need to better understand DCFC stations’ loading and customer service quality. Furthermore, the relationship between the initial investment decision on building certain number of ports and customer satisfaction should be quantified. This paper aims to analyze these aspects using one million vehicle days of travel data within the Columbus, OH, USA, region. Monte Carlo analysis is carried out in three types of areas—urban, suburban, and rural—to quantify the effect of uncertain parameters on DCFC station loading and service quality. Additional simulations based on a homogeneous vehicle population are carried out, and closed-form equations are derived therefrom to estimate charging duration and waiting time in the queue. Optimization of DCFC station design is also addressed through the number and capacity of ports.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.